My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009671
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
ARCHIVED REPORTS XR0009671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 2:04:56 PM
Creation date
7/30/2019 11:54:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009671
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> WORK PLAN ADDENDUM <br /> FOR HYDROCARBON IMPACTED SOIL ASSESSMENT <br /> 3430 South El Dorado Street <br /> Stockton, California <br /> June, 1994 <br /> LO INTRODUCTION <br /> In accordance with a request from Mr. John Urrutia of the Bank of Stockton, Geological <br /> Audit Services, Inc. (GeoAudit) has prepared this Work Plan Addendum for Hydrocarbon <br /> Impacted Soil Assessment at 3430 South El Dorado Street in Stockton, California(the site). <br /> 2.0 BACKGROUND <br /> 2.1 Site Location <br /> • The site is located in a flat industrial area south of Stockton (Figure 1). The facility consists <br /> of a large warehouse and adjoining office and exterior fenced parking/delivery area (see <br /> Figure 2). Gutter Lumber is located to the north of the site, and currently manufactures <br /> wooden pallets. <br /> 2.2 UST Removal, 1991 <br /> Three underground tanks were removed from the delivery area in June of 1991. Gasoline <br /> contamination was detected in three of the seven soil samples collected from the excavation, <br /> indicating that an unauthorized release of hydrocarbons had occurred and that an <br /> assessment of the site was required. <br /> 2.3 Initial Assessment <br /> The assessment of the site was performed in two phases. Each phase consisted of <br /> overexcavation followed by the collection and analysis of soil samples from the walls and <br /> floor of the excavation. The first phase of excavation was performed from September 16 <br /> to 24, 1991. The second phase was performed on October 31 and November 1, 1991. The <br /> cavity was enlarged to approximately 50 by 40 feet and a depth of 34 feet. On May 1, 1992, <br /> backfilling of the excavation was completed.The excavation was backfilled to grade with pea <br /> gravel. <br /> &M.1QVWTLIIT WPI.ADD <br />
The URL can be used to link to this page
Your browser does not support the video tag.