Laserfiche WebLink
Bank of Stockton- Cutter Lumber Site Page 2 <br /> Winter Quarter Groundwater Monitoring Report <br /> rProject No. 102.2 I } <br /> L 20 April 1999 <br /> 1.2 Scope of Work I' <br /> The following work was completed during this round of groundwater monitoring: <br /> 1. Depth to water measurements completed on January 19, March 2, and <br /> March.24, of 1999. <br /> 2. Groundwater monitoring which included sample collection from seven wells <br /> in the vicinity of the northerly (Cutter Lumber). Two wells in the vicinity of <br /> the southerly (Western Lift) release were also sampled on this round. <br /> t <br /> { <br /> I <br /> T, I <br /> i <br /> k <br /> ` F <br /> 2937 Veneman Ave.,#11240 Geo-Phase Environmental Inc. Phone (209) 569-0293 ' <br /> Modesto, CA 95356 Fax(209)569-0293 I <br /> i.. <br />