Laserfiche WebLink
IBank of Stockton Cutter Lumber Site Page 2 <br /> Spring Quarter Groundwater Monitoring Report <br />' Project No 102 2 <br /> . July 13, 1998 <br />' In March of 1998, six groundwater monitoring wells were installed to monitor <br /> the size and extent of the groundwater plume <br />' 1.2 Scope of Work <br />' The following work was completed during this round of groundwater monitoring <br /> 1 Monthly depth to water measurements completed in the months of April and <br />' May <br /> 2 Groundwater monitoring which included sample collection from seven <br /> recently installed wells and depth to water measurements in the seven <br />' recently installed wells and the two pre-existing wells associated with the <br /> release at the Western Lift site <br /> I <br /> I � <br /> I <br /> I <br /> I <br /> I <br /> • <br />' 2937 Veneman Ave,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br /> I <br />