My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009739
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
ARCHIVED REPORTS XR0009739
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 1:55:30 PM
Creation date
7/30/2019 1:04:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009739
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Bank of Stockton - Cutter Lumber Site Page 6 <br /> Groundwater Monitoring Well Construction <br />' Project No 102 2 <br /> . April 24, 1998 <br />' within a traffic safe well box The following table summarizes the construction <br /> details of these seven wells <br />' Well Construction Details <br /> Well No TD Screen Interval Seal Slot Size <br />' MW-6 45' 45' - 20' 20'- 18' 0 020" <br /> MW-7 45' 45' - 20' 20'- 18' 0 020" <br /> MW-8A 90' 90' - 80' 76 - 72' 0010" <br /> MW-813 50' 50' - 25' 25'- 23' 0 020" <br />' MW-9 45' 45' - 20' 20'- 18' 1 0 020" <br /> MW-10 45' 45' - 20' 20'- 18' 0 020" <br /> MW-11 45' 45' - 20' 20'- 18' 0 020" <br />' After the monitoring wells were constructed, the vertical and lateral position of <br /> each well was determined by a licensed surveyor The elevations were tied to <br />' sea level based on a nearby City of Stockton bench mark <br />' 2.2 Groundwater Monitoring Well Development & Monitoring <br /> 2.2.1 Monitoring Well Development <br /> After construction, the wells were developed on March 12, 1998 by Del-Tech <br /> Geotechnical Services of Oakdale, CA Each well was opened and the water <br /> level allowed to equilibrate As each well was opened, and prior to taking the <br /> depth to groundwater measurement, a PID organic vapor meter was used to <br /> screen for VOC's in the head space of the well The depth to groundwater was <br />' measured by lowering an electronically actuated air / water interface detector <br /> suspended from a polyethylene measuring tape calibrated to the nearest 0 01 <br /> foot (see groundwater monitoring data sheets in Appendix C) A careful notation <br />' made of the depth to groundwater as measured by the device Special effort was <br /> made to determine if free phase gasoline might be present in MW-6 or MW-7 <br /> An electronically actuated oil / water interface detector was lowered into these <br />' wells for this purpose No measurable free product was detected <br />' Each well was developed by inserting a Grundfuss submersible pump into the <br /> well and lowing it to bottom Well water was pumped into 55 gallon DOT <br /> approved polyethylene drums, properly labeled, and temporarily stored on-site <br />' The rate of well purging was monitored, and each well was purged of at least <br /> three casing volumes or until the groundwater parameters (temperature, <br /> conductivity, and pH) had stabilized indicating that water representative of <br />' actual aquifer conditions was entering the well Groundwater parameter <br /> stabilization was characterized by three successive readings within 10 percent <br /> 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.