Laserfiche WebLink
Bank of Stockton- Cutter Lumber Site Page 8 <br /> Groundwater Monitoring Well Construction <br />' Project No 102 2 <br /> April 24, 1998 <br />' A total of 5 drums of gasoline contaminated purge & rinseate water were <br />' generated during the activities described above American Valley <br /> Environmental was contacted to pick-up and dispose of the water at an approved <br /> petroleum recycling facility In April 10, 1998, the drums were emptied and the <br /> water was disposed of Documents relating to the water disposal are herein <br />' attached <br /> 1 <br /> 1 <br /> 1 <br />'•1 <br /> 1 <br /> 1 <br />' 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto,CA 95356 Fax (209) 569-0293 <br /> I <br />