My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009884
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
ARCHIVED REPORTS XR0009884
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 1:42:44 PM
Creation date
7/30/2019 1:16:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009884
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rReport—Remedial Action Feasibility Page 4 <br /> Cutter Lumber—Western Lift Site <br />' GPE Project No 102 3 <br /> . August 1,2003 <br />' 1.2.2 Scope of Work <br /> The work documented in this report encompasses the following principal elements <br />' • A water well (receptor) survey to identify all groundwater production wells located <br /> within 2,000 feet of the point of release <br />' • Using mass balance principals to estimate the residual gasoline mass in the <br /> subsurface <br /> • Construct a pilot vapor extraction system / air sparge system (VES/AS) One new <br /> vapor extraction and one new air sparge well were drilled and constructed <br /> • Operate the pilot vapor extraction / air sparge system This test entailed 7 days of <br /> VES and AS operation Air was infected into the new sparge well with a compressor, <br />' and gasoline-laden vapors were extracted from the VE well with a blower / ring <br /> compressor For the last two days of the test period, the vapor extraction operation <br /> was modified to draw from a previously existing groundwater monitoring well (MW- <br /> 7) Air samples were collected and the efficiency of the VES and VES/AS systems <br /> was evaluated <br /> Based on the results of the pilot test as well as past work performed at the site as well <br /> ras the adjacent Manna Pro site, a Feasibility Study evaluated the effectiveness of at <br /> four possible remedial methods described above <br /> 1� <br /> r <br /> r <br /> r <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> s <br /> r2937 Veneman Ave ,#13240 Geo-Phase Environmental Inc Phone(209) 569-0293 <br /> Modesto, CA 95356 Fax(209)569-0295 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.