Laserfiche WebLink
' DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br />' MONITORING WELL FIELD LOG 1999 <br />' SAMPLE LOCATION/MW - 4 DATE: 1015/99 <br /> PROJECT NAME: CUTTER LUMBER ANALYSIS PERFORMED: 5EE CHAIN OF CUSTODY <br />' ADDRESS: 3430 S ELDORADO SAMPLE TIME: 1157 <br /> CITY STATE: STOCKTON,CALIF SAMPLE CONTAINERS 2 VOA'S& 1B B <br /> SITE CONTACT: PRESERVATIVES: HCL <br />' CONSULTANT: GEO-PHASE ENVIRONMENTAL LAB.ANALYSIS BY: SHERWOOD <br /> PROJECT MANAGER STEVE LANKFORD MONUMENT: FLUSH <br />' SAMPLER: I DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED: WELL CASING DIA.: 2" / 01632 <br /> SAMPLE MEDIA GROUNDWATER P.I.D.READING/ODOR: NIA NONE <br /> TOP OF CASING ELE ON: MSL COLOR: LIGHT GREY <br />' DEPTH TO WATER: (feeL100th's 2974 FEET CALC.PURGE VOL.: 3515328 GAL <br /> DEPTH OF WELL: (feeL100th's) 5128 FEET TOTAL VOLUME PURGED. 12 GAL <br /> STANDING WATER COLUMN: 2154 FEET DEPTH OF PUMP: 40 FEET <br /> FIELD PARAMETERS <br />' TIME CASING DRAW PUMPING pH E.C. TEMP. O.R.P. ISSOLVEE TURBIDITY <br /> VoLUMH DOWN RATE OXYGEN COLOR <br /> PER PURGE (D T.W) (GPM/LPW (units) smHOS) I(Cdadus) (Mvolts) (PPNO (N T U) <br /> d NIA 5 GPM 792 874 212 -153 NIA LT GREY <br /> 4 797 903 21 -88 " <br /> 8 11795 863 206 -157 " <br /> 12 798 900 21 -96 " <br /> 1P=F <br /> PURGE METHOD- PURGERPUMP <br /> SAMPLE METHOD F STAINLESS STEEL BAILER W/STAINLESS STEEL WIRE LINE <br /> D.T W.AFTER PURGE: D T.W.AT SAMPLE TIME 34 42' <br />' WELL INTEGRITY CAP&SEAL ARE NOT SECURE AMERICAN LOCK INSTALLED <br /> WELL LOCATION. SFE SITE MAP <br /> REMARKS' <br />' WEATHER. CLEAR SKIES WIND NW5 <br /> QUALITY CONTROL- ALL PURGING E UIPMENT AND SAMPLING EQUIPMENT WAS CLE4NED IN THE <br /> FIELD WIT7I A STEAMCLEANER do ALCONOX SOAP NEW NTTRILE GLO VES <br />' CONTAINMENT. D O T 17 SS GAL STEEL DRUM OR 60 GAL POLY DRUM <br /> INSTRUMENTATION. Y S 13560 FLOWCELL Y S L DISSOLVED OXYGEN MLTE <br /> SOLIMST SLOPE METER THERMODINE 580B P I D <br /> KECK INTERFACE METER 'TURBIDITY METER <br />