Laserfiche WebLink
' PP RT SERVICES <br /> DEL-TECHGEOTECHNICAL SUPPO <br />' MONITORING WELL FIELD LOG 1999 <br />' if ...... .. <br /> SAMPLE LOCATION 1 MW - 6 DATE: 10/5/99 <br /> PROJECT NAME: CUTTER LUMBER ANALYSIS PERFORMED: SEE CHAIN OF CUSTODY <br />' ADDRESS: 3430 S ELDORADO SAMPLE TIME: 1510 <br /> CITY STATE: STOCKTON,CALIF SAMPLE CONTAINERS- 2 VOA'S& 1 B B <br /> SITE CONTACT: PRESERVATIVES: HCL <br />' CONSULTANT: GEO-PHASE ENVIRONMENTAL LAB.ANALYSIS BY: SHERWOOD <br /> PROJECT MANAGER STEVE LANKFORD MONUMENT: FLUSH <br />' SAMPLER: I a . 1, DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED: WELL CASING DIA.: 2" / 01632 <br /> SAMPLE MED GROUNDWATER P.I.D.READING/ODOR: N/A GAS <br />' TOP OF CASING ELE ON: MSL COLOR: GREY <br /> DEPTH TO WATER: teet.100th's 2961 FEET CALC.PURGE VOL.: 2549184 GAL <br /> DEPTH OF WELL: [eet.100th's 4523 FEET TOTAL VOLUME PURGED: 9 GAL <br /> STANDING WATER COLUMN: 1562 FEET DEPTH OF PUMP: 40 FEET <br />' FIELD PARAMETERS <br /> TIME CASING DRAW SUBMERS pH E.C. TEMP. O.R.P DISSOLVE TURBIDITY <br /> VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE (D T W) (GPM/LP" (UnAts) (UsMEEOS) (Cewas) (Mvolts) (PPM) (N T U) <br /> 0 N/A 5 GPM 734 1051 196 -192 N/A GREY <br /> 3 734 1045 195 -199 " <br /> 6 724 1050 195 -193 <br /> 9 726 1053 194 -190 " <br /> 1 <br />' PURGE METHOD. PURGERPUMP <br /> SAMPLE METHOD. 1'STAINLESS STEEL.BAILER W/STAINLESS STEEL WERE LINE <br /> D T W AFTER PURGE. D T W.AT SAMPLE TIME 36 71' <br /> WELL INTEGRITY CAP&SEAL ARE SECURE AMERICAN LOCK INSTALLED <br /> WELL LOCATION SEE SITE MAP <br /> REMARKS, GAS SHEEN DROPLETS <br />' WEATHER. CLEAR SKIES WIND: NW5 <br /> QUALITY CONTROL ALL PURGING fa UIPMENT AND SAMPLING E UIPMEM'WAS CLEANED IN THE <br /> FIELD WHN A SMUCLEANER&ALCONOX SOAP NEW NII RILE GLOVES <br />' CONTAINMENT- DOT 17 55 GAL.STEEL DRUM OR 60 GAL POLY DRUM <br /> INSTRUMENTATION: Y S I 3560 FLOWCELL Y S I DISSOLVED OXYGEN METER <br /> SOLINIST SLOPE METER THERMODINE 580E P I.D <br /> KECK INTERFACE METER TURBIDITY METER <br />