Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Bank of Stockton - Cutter Lumber Site Page 7 <br /> Quarterly Groundwater Monitoring Report <br /> Project No. 102.2 <br /> . July 20, 2005 <br /> 4.0 LIMITATIONS <br /> The conclusions presented in this report are professional opinions based on <br /> information obtained from the field work, analytical data and observations <br /> herein described. Geo-Phase Environmental Inc. can make no guarantees or <br /> warranty as to the impact of conclusions and recommendations contained herein <br /> ' may have upon the value of the Property, or its facility of sale. <br /> ' This work was performed solely for the use of our client. Any reliance on this <br /> report by a third party is at the party's sole risk. <br /> In the event of any defect or deficiency in the services of any nature, whether <br /> patent or latent, Geo-Phase Environmental Inc. shall have no responsibility <br /> thereto. In no event shall Geo-Phase Environmental Inc. be liable to any person <br /> ' or other entity for special, incidental, or consequential damages. <br /> Geo-Phase Environmental Inc. is not responsible for undisclosed conditions. <br /> 1 <br /> 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0293 <br /> t <br />