My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009900
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
ARCHIVED REPORTS XR0009900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 1:52:55 PM
Creation date
7/30/2019 1:24:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009900
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan-Pilot Testing Page 15 <br /> Cutter Lumber Site <br /> Project No. 102.3 <br /> October 30,2001 <br /> I <br /> 7.0 REPORTING <br /> Two separate reports will be issued. The first will be a report of the pilot remedial system <br /> and its operation, and the second will be a feasibility study that evaluated various <br /> remedial alternatives <br /> 7.1 Pilot Testing <br /> A report will be submitted upon completion of the work outlined above. This includes <br /> sections documenting the construction of new service wells and the installation and <br /> ' operation of the pilot testing. The results of the pilot test will be summarized and <br /> evaluated, and conclusions will be draw regarding the effectiveness of vapor extraction <br /> and vapor extraction with air sparging. <br /> ' 7.2 FeasibilityStudy <br /> Y <br /> ' The second report will evaluate several remedial options. Once the options are evaluated, <br /> a remedial alternative can be chosen based upon the results of the pilot test and the results <br /> • of the previous pilot investigation. Once a remedial alternative is chosen, a Remedial <br /> ' Action Plan can be created describing the construction and operation of a remedial system <br /> for the site. This will include a discussion of previously completed characterization and <br /> pilot work at the site. <br /> 7.1.1 Evaluation 1 - Natural Attenuation <br /> ' This portion of the report will discuss the implications of a monitoring only approach. <br /> 1 7.2.2 Evaluation 2 - Soil Vapor Extraction <br /> This section will discuss soil vapor extraction and its effectiveness alone as a remedial <br /> option. <br /> 7.2.3 Evaluation 3 - SVE with Groundwater Pumping <br /> This section will discuss thep otential for combining soil vapor extraction with <br /> groundwater pumping to remediate soil and groundwater contamination at the site. <br /> i <br /> 2937 Veneman Ave.,46240 Geo-Phase Environmental Inc. Phone(209)569-0293 <br /> Modesto, CA 95356 Fax(209)569-0295 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.