Laserfiche WebLink
Work Plan-Pilot Testing Page 16 <br /> Cutter Lumber Site <br /> Project No. 102.3 <br /> October 30,2001 <br /> 7.2.4 Evaluation 4 - SVE with Air Sparging <br /> This portion of the report will discuss the potential effectiveness of air sparging in <br /> combination with soil vapor extraction in remediating contamination in the soil and <br /> groundwater at the site. <br /> ' 7.3 Quarterly Monitoring <br /> Routine quarterly groundwater monitoring will continue using the established schedule. <br /> Quarterly S_em_i-Annually <br /> ' MW-6 MW-4 <br /> MW-7 MW-5 <br /> MW-8B <br /> ' MW-9 <br /> MW-10 <br /> MW-11 <br /> ' <br /> Upon completion of each event, a quarterly groundwater monitoring report will be <br /> completed. <br /> 1 <br /> 1 <br /> 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone(209) 569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br />