Laserfiche WebLink
Bank of Stockton.- Cutter Lumber Site Page 2 <br /> Quarterly Groundwater Monitoring Report <br /> ' Project No. 102.2 <br /> February 6,2004 <br /> In June of 2003, a pilot test of soil vapor extraction and air sparging was <br /> completed as documented in the August 1, 2003 report entitled Report, Remedial <br /> Action Pilot Test and Feasibility Stud Recently, a final corrective action plan <br /> ' (CAP) was approved by the San Joaquin County Department of Environmental <br /> Health. <br /> 1.2 Scope of Work <br /> The following work was completed during this round of groundwater monitoring: <br /> 1. The depth to groundwater was measured in all eight wells remaining on the <br /> site. <br /> 2. Groundwater monitoring included sample collection from six of the eight <br /> extant wells. <br /> j 3. Purge water from the prior monitoring event was collected for recycling. <br /> i <br /> I <br /> 10 <br /> 1 <br /> t <br /> II <br /> i <br /> ' 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0293 <br /> 1 <br />