Laserfiche WebLink
{ <br /> I <br /> i <br /> Bank of Stockton - Cutter Lumber Site Page 5 <br /> Quarterly Groundwater Monitoring Report <br /> ' Project No. 102.2 <br /> July 21, 2004 <br /> 2.4 Waste Disposal <br /> Purge water from this monitoring event was temporarily stored in 55-gallon <br /> drums on the site. The waste water will be removed for recycling prior to the <br /> next monitoring event. Water from the prior event was removed for recycling <br /> ' on May 25, 2004 by American Valley Waste Oil, a licensed hazardous waste <br /> hauler. A copy of the manifest is attached as Appendix C. <br /> ' 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0293 <br /> 1 ' <br />