Laserfiche WebLink
Bank of Stockton - Cutter Lumber Site Page 6 <br /> Quarterly Groundwater Monitoring Report <br /> ' Project No, 102.2 <br /> July 21, 2004 <br /> 3.0 DISCUSSION <br /> ' 3.1 Discussion of Data <br /> Field and analytical data results are summarized in Tables 1 and 2 and <br /> illustrated in Figures 3 through 5. <br /> The contour map of the groundwater surface (Figure 3) suggests that the flow of <br /> groundwater is to the northeast, and appears generally consistent with <br /> historical norms. Over the past quarter the groundwater elevation fallen about <br /> 2 feet from the prior monitoring event. <br /> Over the years, the contaminant concentrations have displayed a gradual <br /> downward trend in all of the wells except MW-8B and MW-9. <br /> 3.2 Future Work Schedule <br /> Quarterly �oundwater monitoring and sampling should continue. The San <br /> Joaquin County EHD has approved a Corrective Action Plan (CAP). <br /> lie Construction of the remedial system is underway. Eight new service wells have <br /> been constructed and the surface system is now being fabricated. A permit to <br /> ' operate the system will be needed from the San Joaquin County Unified APCD <br /> before the completed system can be operated. <br /> I <br /> 1 II <br /> 1 <br /> ' 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0293 <br /> I ` I <br />