Laserfiche WebLink
UNIT IV LOP <br /> No FURTHER ACTION (NFA) CLOSURE CHECK LIST <br /> G LJ� 9/15/ <br /> SITE ADDRES " <br /> LOP STAFF: <br /> SITE NAME: <br /> [DATE: 0 /� <br /> FA requested by RP or LOP Staff reviewed site with PG and determined it qualifies for NFA. <br /> y.l! 11OP Staff verified GeoTracker(GT) "Closure Review" screen still marked "No"at"Is This Case Ready for.Closure?" <br /> rp�LOP Staff advises CVRWQCB of NFA consideration. <br /> �f I�1l�LOP staff and PG/PC discuss NFA consideration with CVRWQCB at Unit Meeting, by phone, or e-mail. <br /> LOP Staff drafts Case Closure Summary(CCS). <br /> LOP Staff has CCS verified by `third party' staff member. CCS Reviewed by <br /> LOP Staff prepares 30-day notification letter to CVRWQCB of intention to issue an NFA that includes the CCS. <br /> LOP Staff submits 30-day CVRWQCB NFA with CC to wat r purveyor to PC for review and signature. <br /> Copy of 30-day letter and CCS sent to: W (name f w er purveyor) <br /> CVRWQCB 30-day response date upon.: t concurrence received on: ul ZO <br /> 30-day extension requested to: Non-concurrence letter from CVRWQCB Management <br /> 'received on: Staff up loads CVRVQCB letter without CCS into GT on] <br /> /which begins Public Participation Notice notification of days. Ace; <br /> —1Oc t� <br /> 94691- gI (,Loa <br /> /`/D <br /> 6 ocumentation received, filed, and flagged that indicates the"current record owner(s) of fee title to the site have <br /> been notified", per Section 25297.15 (a). The NFA closure letter may not be issued without this <br /> documentation. <br /> � <br /> 9 f zs <br /> LOP Staff directs RP to destroy II wells,, remove all site waste material, and provide documentation that the waste <br /> material was properly disposed, LOP staff reviews and approves work plan for well de4truittion. Destruction permits <br /> issued after 60 days of posting of the Closure Public Notice. Permits issued on 2.0 <br /> LOP Staff documents destruction of all monitoring wells. GT"Groundwater Monitoring" screen updated to indicate <br /> wells are destroyed. The NFA closure letter may not be issued until wells are destroyed. <br /> '¢ LOP Staff verifies and flags documentation received indicating all onsite waste material removed and properly <br /> disposed and verified with EHD accounting all SIR& D site fees have been paid. The NFA closure letter may <br /> not be issued without this documentation. GT"Closure Review" screen marked"Yes"at"Is This Case Ready <br /> for Closure?" <br /> J Ad r"A,f, #-441;r a1L.,( <br /> PG/PC reviews file-with flagged documents by LOP Staff and approves clerical issuance of NFA and CCS for <br /> ''//Director's signature. <br /> "�7' <br /> 5`t LOP staff provides name and addresses of all RPs to the Clerical. Clerical generates a NFA and CCS to be signed <br /> by Directorfor each RP (not consultants). NFA& CCS generated only if PG/PC signed off above. Signed CCS <br /> and NFA are copied. Originals mailed to RP. Copies filed into LOP File, given to Management, and given to staff to <br /> upload into GT. <br /> Clerical staff updates Envision to reflect site is Closed. <br /> LOP staff pulls all site files for clerical staff to file in LOP Closed File cabinets until scanned into Questys. <br /> LOP staff updates GT"Project Information"screens to reflect site status as Closed. <br />