Report-Well Abandonment Page 5 <br /> Western Lift/ Cutter Lumber Site- Case 2 <br /> GPE Project No. 102.3 <br /> March 28, 2014 <br /> Upon completing the pressure grouting, the drilling rig was used to over drill the surface <br /> well box. A 2-foot diameter bucket auger was used to cut through the pavement and <br /> remove the well box and surrounding cement collar to a depth of at least 3 feet. The well <br /> casing was then cut off, leaving a short casing stub of about 6 inches above the bottom of <br /> the excavation. Next, additional grout was pumped into the pit and brought up to a depth <br /> sufficient to cover the casing stub by at least 6 inches. After the cement was allowed to <br /> set, the remainder of each excavation was filled with base rock gravel to a depth of 4 <br /> inches below grade. <br /> 2.4 Finish Work <br /> Upon completion of the over drilling or pressure grouting, each former well site was <br /> brought back to grade with redi-mix concrete. <br /> 2937 Veneman Avenue,Suite B240 Geo-Phase Environmental Inc. Phone: (209)569-0293 <br /> Modesto,Ca 95356 Fax: (209)569-0295 <br />