Laserfiche WebLink
Lot Line Adjustment <br /> Page 2 of 2 <br /> 3) Proposed New Parcel 2 currently has a deep water <br /> supply well capable of producing water at a leveled rate <br /> of approximately 379 . 6 gallons/at 103PSI2. This well, <br /> if placed in service, could dramatically complicate the <br /> groundwater cleanup of Parcel 1 by drawing down on and <br /> pulling laterally on the contamination plume. . ,PHS/EHD <br /> strongly recommends the destruction of this abandoned <br /> well under the requirements of San Joaquincounty <br /> ordinance No. 1862 . Contact with a representative of the <br /> California Water Service stated, they can provide public <br /> water to this site if desired. <br /> l <br /> J <br /> 2 ERM West Phase II Environmental Property Assessment February <br /> 10, 1990. <br />