My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009441
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009441
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:17:57 PM
Creation date
7/30/2019 2:07:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009441
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3E-W GROUNDWATER <br /> LITECHNOLOGY, INC. 4057 Port Chicago Highway Concord CA94520l41516i1-2387 <br /> FAX 14131685-9I48 <br /> November 20, 1992 <br /> Project No 020502819 ypslyxj Mr Steve Schneider <br /> San Joaquin County Public Health Services <br /> 445 N San Joaquin Street NOV N 3 19g2 <br /> Stockton, CA 95201 <br /> ENVIRONMENTAL hEAUR <br /> RE Manna Pro Facility PERMIT/SERVICES <br /> 4004 S EI Dorado <br /> Stockton, California <br /> Dear Mr Schneider <br /> This letter serves to notify San Joaquin County Public Health Services (SJCPHS) of Manna Pro <br /> Corporation's intent to implement selected tasks outlined in the Work Plan for Characterization and <br /> Remediation of Stockpiled Soils and Tank Pit Excavation Backfilling, dated July 30 1992 Based <br /> upon the meeting between SJCPHS and the Regional Board (RWQCB) on November 3, 1992, we <br /> 1 understand that the RWQCB will not approve of backfilling the tank pit with the excavated sods until <br /> they have reviewed the results of soil pile characterization sampling For this reason we plan to <br /> proceed with Task 1 of the work plan, which is sod pile sampling and analyses Upon receipt of <br /> laboratory analyses results, a brief letter report will be provided to SJCPHS and RWQCB for review <br /> by December 31, 1992 The letter report will Include our recommendations regarding what to do <br /> with the stockpiled sod This is consistent with the November 16, 1992 letter from your office to <br /> Manna Pro <br /> In addition, Manna Pro would like to begin the process of tank pit backfilling, by placement of <br /> approximately 1,200 cubic yards of fill material stockpiled on site from unrelated construction <br /> activities The backfilling will be performed as described in the work plan <br /> Manna Pro would like to begin these tasks as soon as possible Once the subcontractors can be <br /> scheduled, we will notify SJCPHS and RWQCB regarding the date(s) of field work We anticipate <br /> that the sod sampling will be performed the week of December 7, 1992 <br /> If you have any questions or comments, please call either Mr Dean Willis of O'Melveney & Myers at <br /> (213) 669-6000, or me at (510) 671-2387 <br /> Sincerely, <br /> GROUNDWAT OGY, INC <br /> Richard M TtLomasse <br /> Hydrogeologist <br /> Project Manager <br /> cc E Thayer, California Regional Water Quality Control Board - Central Valley Region <br /> Offices throughout the U S Canada and Overseas <br />
The URL can be used to link to this page
Your browser does not support the video tag.