Laserfiche WebLink
i <br /> I Work Plan for Characterization and Remediation of Stockpiled Sods July 30, 1992 <br /> Manna Pro Facility, 4004 Ei Dorado Street, Stockton, CA 11 <br /> CONTENTS <br /> 10 INTRODUCTION 1 <br /> 20 BACKGROUND INFORMATION 2 <br /> 21 Site and Surrounding Area: 2 <br /> 22 Previous Environmental Site Work 2 <br /> 23 Quarterly Groundwater Monitoring and Sampling Program 4 <br /> 30 SCOPE OF WORK 4 <br /> Task 1 Soil Characterization Sampling 4 <br /> Task 2 Backfilling 5 <br /> Task 3 Sod Remediation 6 <br /> I Task 4 Soil Confirmation Sampling 6 <br /> Task 5 Backfilling and Compaction 7 <br /> Task 6 Final Report 7 <br /> Task 7 Project Schedule 7 <br /> 40 CLOSURE 7 <br /> I <br /> FIGURES <br /> FIGURE 1 SITE LOCATION MAP <br /> FIGURE 2 SITE PLAN <br />' APPENDICES <br /> IAPPENDIX A ERM REPORT - SOIL AND GROUNDWATER INVESTIGATION <br /> APPENDIX B GROUNDWATER TECHNOLOGY'S STANDARD OPERATING PROCEDURES <br /> I (SOPS) <br /> I <br /> GROUNDWATER <br /> ___,--TECHNOLOGY, INC <br /> I <br />