Laserfiche WebLink
1 <br /> i <br /> Pilot Testing Report and Conceptual Corrective Action Plan July 15, 1994 <br /> Manna Pro, 4004 South EI Dorado, Stockton, CA 29 <br />' 72 Remedial System Installation <br />' The remedial system for the source areas will be permitted and installed following completion of the <br /> final system design and acceptance by Manna Pro and SJCPHS <br /> 73 Remedial System Start-up and Calibration <br />' The remedial system(s) will be initiated and monitored for performance Adjustments and alterations <br /> will be performed to enhance and optimize recovery operations The start-up and calibration is <br />' expected to require one to two months after installation <br />' 74 Operation, Maintenance, and Monitoring <br />' The system will be properly operated and maintained to ensure that the objectives of the remedial <br /> program are met System effluent and air emissions will be monitored to ensure compliance with all <br /> environmental regulations which apply to the system <br /> 75 Closure <br /> The remedial system will be operated and maintained until the sooner to occur of 1) the time at <br /> which soil and groundwater have been remediated in compliance with law, or 2) the time at which <br /> further operation of the remedial system described in this report will no longer result in significant <br /> additional remediation of the site Thereafter, a closure report will be prepared and submitted to the <br /> San Joaquin County Public Health Services to approve closure <br /> 8.0 SUMMARY AND CONCLUSIONS <br />' The information provided in this report is summarized as follows <br /> • The soil and groundwater at Manna Pro Facility at 4004 EI Dorado Rd in Stockton, <br /> CA has been impacted by past releases of gasoline and diesel fuel from former <br /> U STs <br />' The groundwater gradient in the area of investigation is generally to the north <br /> 2818R034 670 <br /> GROUNDWATER <br />' TECHNOLOGY, INC <br />