My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009488
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:08:24 PM
Creation date
7/30/2019 2:28:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009488
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AZURE ENVIRONMENTAL <br /> well MW-7 ILstoncal data indicate benzene has not been detected at concentrations greater than <br /> 0 5 ppb in downgradsent well MW-9 since January 1995 (0 6 ppb) and well MW-10 since October <br /> 1994 (0 6 ppb) <br />' Ground-water monitoring data continue to indicate the petroleum hydrocarbon plume is generally <br /> stable and is restricted to shallow ground water in the area adjacent to the former UST locations <br /> at the,Site <br /> 4.0 TECHNICAL STATUS REPORT <br /> Work Completed During the Fourth Quarter 1998 <br /> Work completed during the fourth quarter included performance of the quarterly ground-water <br /> monitoring program <br /> On September 10, 1998, Azure submitted to the SJCEHD a proposal for work activities to close <br /> a hydraulically actuated bulk truck emptying platform contained in a concrete-lined bunker <br /> ("platform bunker") at the Site An approval was received from the SJCEHD on September 11, <br /> 1998 A special discharge permit was obtained from the City of Stockton Department of <br /> Municipal Utilities, prior to completing the platform bunker closure activities on January 8, 1999 <br /> • The contents of the platform bunker were removed and discharged in accordance with the special <br /> discharge permit Following removal &its contents, the sides and base of the bunker were <br /> pressure washed and the rinseate removed for discharge to the sanitary sewer No additional <br /> closure activities are planned for the platform bunker <br /> Work Expected to be Completed During the First Quarter 1999 <br /> � 1} � <br /> Work expected to be completed during the first quarter includes continued performance of the <br /> quarterly ground-water monitoring program <br /> I <br />' 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.