My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009493 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009493 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:23:30 PM
Creation date
7/30/2019 2:30:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009493
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AZURE ENVIRONMENTAL <br /> Ground-water monitoring data continue to indicate the petroleum hydrocarbon plume is generally <br /> stable and is restricted to shallow ground water in the area adjacent to the former tank locations at <br /> the Site Residual petroleum hydrocarbon concentrations in Site ground water are expected to <br /> decrease as a result of biodegradation and/or other attenuation processes <br /> I4.0 - TECHNICAL STATUS REPORT <br /> Work Completed During the Second Quarter 1997 <br /> Work completed during the second quarter included performance of the quarterly ground-water <br /> monitoring program <br /> IWork Expected to be Completed During the Third Quarter 1997 <br /> IWork expected to be completed during the third quarter includes continued performance of the <br /> quarterly ground-water monitoring program <br /> IA Workplan for Site Closure is expected to be submitted to the S7CPHS during the third quarter <br /> 1997 The Workplan will outline the work tasks and schedule for evaluating closure cntena and <br /> completing site closure actions at the Site <br /> I <br /> . 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.