My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009497
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009497
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:24:40 PM
Creation date
7/30/2019 2:31:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009497
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Former Manna Pro Site Page 2 <br /> Quarterly Groundwater Monitoring Report <br />' Project No 207 2 <br /> 12 November 1999 <br />' This included installing 25 soil borings into groundwater of which, a total of 6 <br /> borings were later converted to groundwater monitoring wells Later, <br />' Groundwater Technology Inc (GTI) installed four additional monitoring wells, a <br /> combination groundwater/vapor extraction well and three observation wells <br /> These wells were used for the completion of groundwater pumping and vapor <br />' extraction pilot tests To date, a total of 10 groundwater monitoring wells, 3 <br /> observation wells, and one combination groundwater and vapor extraction well <br /> have been constructed on or near the Manna Pro site Since 1996, the principal <br />' remedial activity has consisted of groundwater monitoring <br /> 1.2 Scope of Work <br />' The following work was completed during this round of groundwater monitoring <br />' 1 Thirteen wells were equipped with new, traffic rated well boxes All wells <br /> were also surveyed by a licensed surveyor <br /> I2 The depth to groundwater was measured in 10 monitoring wells located on, <br /> or near the site <br /> 3 Groundwater monitoring included sample collection from five wells <br /> I <br /> 2937 Veneman Ave ,#B240 Geo-Phase Environmental lnc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.