Laserfiche WebLink
' Former Manna Pro Site Page 2 <br /> Quarterly Groundwater Monitoring Report <br />' Project No 207 2 <br /> 12 November 1999 <br />' This included installing 25 soil borings into groundwater of which, a total of 6 <br /> borings were later converted to groundwater monitoring wells Later, <br />' Groundwater Technology Inc (GTI) installed four additional monitoring wells, a <br /> combination groundwater/vapor extraction well and three observation wells <br /> These wells were used for the completion of groundwater pumping and vapor <br />' extraction pilot tests To date, a total of 10 groundwater monitoring wells, 3 <br /> observation wells, and one combination groundwater and vapor extraction well <br /> have been constructed on or near the Manna Pro site Since 1996, the principal <br />' remedial activity has consisted of groundwater monitoring <br /> 1.2 Scope of Work <br />' The following work was completed during this round of groundwater monitoring <br />' 1 Thirteen wells were equipped with new, traffic rated well boxes All wells <br /> were also surveyed by a licensed surveyor <br /> I2 The depth to groundwater was measured in 10 monitoring wells located on, <br /> or near the site <br /> 3 Groundwater monitoring included sample collection from five wells <br /> I <br /> 2937 Veneman Ave ,#B240 Geo-Phase Environmental lnc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br /> r <br />