Laserfiche WebLink
' Corrective Action Plan Page 13 <br /> Former Manna Pro Site <br /> Project No 207 3 <br /> February 16,2001 <br />' vapor extraction piping, and vapor monitoring well heads to continuously measure <br /> pressure and vacuum, as needed Vacuum measurements will be made at nearby <br /> monitoring wells with screened intervals exposed above the water table <br />' 4.3.3 In-Situ Groundwater Parameter <br /> Monitoring <br />' In-Situ dissolved oxygen readings will be made in several nearby on a weekly basis for <br /> the first four weeks of operation and monthly thereafter During the second phase of <br />' system operation, dissolved oxygen readings will be made on a quarterly basis associated <br /> with normal groundwater monitoring Groundwater monitoring will be completed on a <br /> quarterly basis with the following well sampling schedule <br />' Quarterly Semi-Annually Annually <br /> MW-3 MW-1 MW-2 <br />' MW-9 MW-5 MW-4 <br /> MW-10 MW-6 <br /> MW-7 <br /> i MW-8 <br /> i� <br /> I <br /> i <br /> i <br /> I <br /> I , <br /> I <br /> I <br /> • <br /> 2937 Veneman Ave,#8240 Geo-Phase Environmental Inc Phone(209) 569-0293 <br /> Modesto, CA 95356 Fax(209)569-0295 <br /> I <br />