Laserfiche WebLink
1 <br /> 1 GEO-PHASE <br /> 1 <br /> ENVIRONMENTAL <br /> 1 February 16, 2001 <br /> Mr John Minard, CFO <br /> Manna Pro Corporation <br /> 707 Spirit 40 Park Drive, Suite 150 <br /> 1 St Louis, MO 63005 <br /> RE Corrective Action Plan <br /> 1 Former Manna Pro Site,4004 S. El Dorado, Boulevard Stockton,California(Site Code 1088) <br /> Dear Mr Minard <br /> 1 On July 31, 2000, Geo-Phase Environmental Inc submitted a document entitled Report - Remedial <br /> Action Feasib&U Study The purpose of the Feasibility Study was to summarize all available <br /> 1. information regarding the gasoline release at the subject site and to assess the feasibility of four <br /> possible strategies to mitigate it The Feasibility Study concluded that the method most likely to <br /> achieve an adequate level of mitigation in a reasonable time frame is the simultaneous application of <br /> 1 vapor extraction and air sparging <br /> In a letter dated December 18, 2000, the San Joaquin County Public Health Service — Environmental <br /> 1 Health Division directed that a detailed Corrective Action Plan (CAP) be prepared and submitted <br /> documenting the methods and protocols to be used in the work outlined in the Feasibility Study This <br /> current document is a detailed work plan intended to address these issues <br /> If you have questions about the content of the Work Plan or need additional information, please <br />' contact me Thank you for this opportunity to serve your environmental needs <br /> Sincerely, <br /> o-Phase Environme Inc <br /> Stephen M Lankford, RG, REA <br /> President <br /> cc Harlan Knoll, San Joaquin Co, PHS/EHD <br /> . Tony Palma,Cutter Lumber Products <br /> 2937 Veneman Ave,#13240 Geo-Phase Environmental Inc Phone(209) 569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0295 <br /> i <br />