Laserfiche WebLink
t <br />' TABLE OF CONTENTS <br />' 1.0 INTRODUCTION <br /> 1 I Site History <br />' <br /> 12 Current Site Status <br /> 13 Proposed Scope of Work <br /> 1 3 1 Conceptual Basis <br /> 1 3 2 Scope of Work <br />' 2.0 PRELIMINARY WORK <br /> 21 Well Permitting <br />' 22 Air Pollution Control District Permit to Operate <br /> 3.0 VAPOR EXTRACTION & SPARGE WELL INSTALLATION <br /> 31 Soil Boring Installation <br /> 32 Remedial Well Construction <br /> 3 2 1 Vapor Extraction Well Construction <br />' <br /> 322 Air Sparge Well Construction <br /> 33 Well Development <br /> 34 Waste Disposal <br />' 4.0 SURFACE EQUIPMENT INSTALLATION & SYSTEM OPERATION <br /> • <br /> 41 Equipment Installation <br />' 4 1 1 Carbon Unit Installation <br /> 4 1 2 Sparge Pump Installation <br /> 4 1 3 IC Engine/Thermal Oxidizer Installation <br />' 4 1 4 Conveyance Piping/Manifold Installation <br /> 42 System Operation <br /> 4.21 Vapor Extraction System Start-Up <br />' <br /> 422 Air Sparge System Start-Up <br /> 43 System Monitoring <br /> 4 3 1 Process/Effluent Air Monitoring <br /> 432 Vacuum/Flow/Pressure Monitoring <br />' 433 In-Situ Groundwater Parameter Monitoring <br /> 5.0 SOIL, AIR & GROUNDWATER SAMPLING & ANALYSIS <br />' PROCEDURES <br /> 51 Soil Sample Collection <br />' <br /> 52 Groundwater Sample Collection <br /> 53 Air Sample Collection <br /> 54 Soil Sample Analysis <br /> 55 Groundwater Sample Analysis <br />' 56 Air Sample Analysis <br /> 2937 Veneman Ave,#13240 Geo-Phase Environmental Inc Phone(209)569.0293 <br /> Modesto, CA 95356 Fax(209)569-0295 <br /> I <br />