Laserfiche WebLink
Former Manna Pro Site Page 9 <br /> Project No 207 3 <br /> Remedial Feasibility Study <br />' Due to the relatively short duration of the pilot test (several days), a substantial degree of <br /> uncertainty exists regarding the rate at which air sparging will liberate hydrocarbons for <br /> removal by vapor extraction This also makes it impossible to accurately forecast the time <br /> needed to complete the active remediation <br /> For the purposes of assessing the relative feasibility of this method, it is assumed that life of <br />' this method will require four years, and will mitigate the release to the point where a risk- <br /> based closure will be possible The rough estimate of cost of this remedial method is <br /> estimated to be roughly $436,000 <br /> 1 <br /> 1 <br /> 1 <br /> I <br /> 2937 Veneman Ave , #13240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0295 <br />