Laserfiche WebLink
' Report-Pilot Remedial System Test Page l 1 <br /> Former Manna Pro Site <br /> Project No 207 3 <br /> July 31,2000 <br />' 3.5 Waste Disposal <br />' All waste generated during the installation of the wells and borings was temporarily <br /> stored 55 gallon drums The waste consisted of gasoline impacted soil and gasoline <br /> impacted well development water On May 16, 2000 the soil cuttings were removed and <br />' transported to the Forward Landfill Facility On May 2, 2000, the purge water was <br /> collected by American Valley Waste Oil, a licensed hazardous waste hauling company, <br /> for shipment to a recycling faculty Photocopies of the manifests are attached as <br /> Appendix C <br /> • <br /> 2937 Venernan Ave,4B240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0295 <br />