My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009534
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009534
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:17:51 PM
Creation date
7/30/2019 2:34:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009534
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
View images
View plain text
i <br /> = GEO-PHASE <br /> ENVIRONMENTAL <br />' July 31, 2000 <br />' Mr John Minard, CFO <br /> Manna Pro Corporation <br /> 707 Spirit 40 Park Drive, Suite 150 <br />' St Louis, MO 63005 <br /> RE Report- Remedial Action Pilot Study <br />' Former Manna Pro Site,4004 S El Dorado,Street Stockton,California (Site Code 1088) <br /> Dear Mr Minard <br />' On August 16, 1999, Geo-Phase Environmental Inc submitted a Work Plan to the San Joaquin County <br /> Department of Public Health Services, Environmental Health Division The document was entitled, <br />' Work Plan - Deep Groundwater Characterization & Remedial Action Feasibilaty StThe purpose <br /> of the Work Plan was to propose methods and protocols to be used to test the feasibility of certain <br /> remedial methods which were being considered to mitigate the gasoline release at the subject site The <br /> Work Plan also proposed additional work to characterize the vertical distribution of hydrocarbons by <br /> constructing a new, "deep" monitoring well The Work Plan was approved by the County agency, and <br /> later, the California UST Clean-up find issued pre-approval for the costs anticipated in the project <br /> Dunng the week of April 17, 2000, field work for the pilot test began This report documents the <br /> work that has been completed and the results obtained thus far A report documenting the <br />' construction of the deep monitonng well has been previously submitted <br />' Thank you for this opportunity to serve your environmental needs <br /> Sincerel , <br /> -Phase Env ro eeREA <br />' Stephen M Lank , , <br /> President <br /> cc Harlan Knoll, San Joaquin Co , PHSIEHD <br /> Tony Palma, Cutter Lumber Products <br /> 1 <br />' 2937 Veneman Ave 413240 Geo-Phase Environmental Inc Phone(209) 569-0293 <br /> Modesto, CA 95356 Fax(209)569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).