Laserfiche WebLink
1 <br />' TABLE OF CONTENTS <br />' 1.0 INTRODUCTION <br /> 11 Site History <br /> 1 2 Scope of Work <br /> 1 2 1 Conceptual Basis <br /> 1 2 2 Scope of Work <br /> 2.0 WATER WELL SURVEY <br /> 21 Records Search <br /> 22 Physical Search µ ~ <br /> 3.0 PILOT TESTING SYSTEM INSTALLATION ', J <br /> 31 Permitting <br />' <br /> 32 Soil Boring Installation <br /> 33 Pilot Remedial Well Construction =- <br /> 3 3 1 Vapor Extraction Well Construction c-n <br />' <br /> 332 Air Sparge Well Construction <br /> 333 Air Monitoring Well Construction <br /> 334 ORC Slurry Installation <br /> 34 Well Development <br />' 35 Waste Disposal <br /> 4.0 PILOT TESTING SURFACE EQUIPMENT & SYSTEM OPERATION <br /> 41 Pilot System Installation <br /> 4.11 Internal Combustion Engine Installation <br /> 4 1 2 Sparge Pump Installation <br />' <br /> 42 Pilot System Operation <br /> 4 2 1 Sod Vapor Extraction System Start Up <br /> 422 Air Sparge System Start Up <br />' <br /> 43 Pilot System Monitoring <br /> 4 3 1 Process/Effluent Air Monitoring <br /> 432 Vacuum/Flow/Pressure Monitoring <br /> 433 In-Situ Groundwater Parameter Monitoring <br /> 5.0 SOIL & AIR SAMPLING & ANALYSIS <br /> 51 Soil Sample Collection <br />' <br /> 52 Air Sample Collection <br /> 53 Soil Sample Analysis <br /> 54 Air Sample Analysis <br />' 6.0 SAMPLE ANALYTICAL RESULTS <br /> 61 Soil Sample Results <br /> 62 Special Soil Analysis Results <br /> 63 Air Sample Results <br /> 2937 Veneman Ave, #B240 Geo-Phase Environmental Inc. Phone(209) 569-0293 <br /> Modesto, CA 95356 Fax(209)569-0295 <br />