Laserfiche WebLink
' Former Manna Pro Site Page 2 <br /> Quazterly Gioundwater Monitoring Repoit <br /> &Monitoring Well Construction <br /> Pioject No 207 2 <br /> June 2, 2000 <br /> extraction well and three observation wells These wells were used for the <br /> completion of gioundwdter pumping and vapor extraction pilot tests <br />' In April Geo-Phase Environmental Inc constructed a new deep monitoring well <br /> bringing the total to 11 wells This work is documented in this current report <br />' Additional drilling was also completed in association with a pilot level vapor <br /> extraction and air sparge test to evaluate this remedial system program This <br /> work will be fully documented in a forthcoming report <br />' 1.2 Scope of Work <br />' The following work was completed during this round of groundwater monitoring <br />' 1 Pursuant to a directive and subsequent Work Plan, a "deep" monitoring well <br /> (MW-11) was constructed to investigate the vertical distribution of gasoline <br /> hydrocarbons associated with this release <br />' 2 The depth to groundwater was measured an 11 monitoring wells and 5 <br /> observation wells located on, or near the site <br /> 3 Groundwater monitoring included sample collection and subsequent <br /> laboratory analysis from five wells <br /> I <br /> I <br /> I <br /> I <br /> 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br /> I <br />