My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009537
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009537
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:18:07 PM
Creation date
7/30/2019 2:38:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009537
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEO-PHASE <br /> - ENVIRONMENTAL <br /> REPORT <br />' Quarterly Groundwater Monitoring Event <br /> Winter Quarter 2000 <br />' Former Manna Pro Site <br /> 4004 S. El Dorado Street <br />' Stockton, California <br />' Protect No 207 2 <br /> March 2, 2000 <br />' 1.0 INTRODUCTION <br /> Groundwater monitoring wells were installed at the site at various times from <br /> 1990 to 1993 Quarterly groundwater monitoring has been conducted at the site <br /> since the first wells were constructed This work has been performed by several <br />' consulting companies Recently, Geo-Phase Environmental assumed the <br /> responsibilities as the environmental consultant for this remedial investigation, <br />' and this is the second monitoring event completed by Geo-Phase for this site <br /> This report documents a quarterly round of groundwater monitoring and <br /> sampling completed on January 21, 2000 <br /> r1.1. Site History <br />' Two 10,000 gallon underground diesel tanks and two 5,000 gallon underground <br /> gasoline tanks and a single 10,000 gallon underground gasoline tank formerly in <br /> use at the site were removed in 1990 Confirmation soil samples collected from <br />' the tank pit contained elevated levels of gasoline and diesel range petroleum <br /> hydrocarbons Subsequently, several thousand yards of impacted soil were <br />' exacted and removed to help mitigate the release <br /> In October of 1990, ERM West conducted additional work to characterize the <br /> lateral and vertical extent of the hydrocarbon contamination in the sub-surface <br /> This included installing 25 soil borings into groundwater of which, a total of 6 <br /> 2937 Veneman Ave,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.