Laserfiche WebLink
' Former Manna Pro Site Page 2 <br /> Quarterly Groundwater Monitoring Report <br />' Project No 207 2 <br /> March 2, 2000 <br />' borings were later converted to groundwater monitoring wells Later, <br /> Groundwater Technology Inc (GTI) installed four additional monitoring wells, a <br />' combination groundwater/vapor extraction well and three observation wells <br /> These wells were used for the completion of groundwater pumping and vapor <br /> extraction pilot tests To date, a total of 10 groundwater monitoring wells, 3 <br />' observation wells, and one combination groundwater and vapor extraction well <br /> have been constructed on or near the Manna Pro site Since 1996, the principal <br /> remedial activity has consisted of groundwater monitoring <br /> 1.2 Scope of Work <br />' The following work was completed during this round of groundwater monitoring <br /> 1 The depth to groundwater was measured in 10 monitoring wells and three <br />' observation wells located on, or near the site <br /> 2 Groundwater monitoring included sample collection and subsequent <br /> laboratory analysis from nine wells <br /> 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br />