My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009541
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009541
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:28:28 PM
Creation date
7/30/2019 2:42:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009541
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 5 <br /> 1 � <br /> 1 � <br /> GEOTHASE <br /> ENVIRONMENTAL <br /> 1 <br /> 1 August 12, 2002 <br /> Mr Dan Smith, CFO <br /> Manna Pro Corporation <br /> 707 Spirit 40 Park Drive, Suite 150 <br />' St Louis, MO 63005 <br /> RE Corrective Action Plan -Addendum <br />' Former Manna Pro Site,4004 S EI Dorado, Boulevard Stockton,California (Site Code 1088) <br /> Dear Mr Smith <br />' On February 16, 2001 Geo-Phase Environmental Inc submitted a document entitled Corrective Action <br /> Plan, Former Manna Pro Site (CAP) The purpose of the CAP was to describe the methods and <br /> procedures to be employed to mitigate the gasoline impacted soil and groundwater at the subject <br /> Property The CAP was designed to be completed in two phases The first phase, now completed, <br /> was intended to operate for 90 days using one vapor extraction well and two air sparge points This <br /> would allow any final engineering design changes prior to constructing the bulk of the final remedial <br /> system The original CAP called for an addendum to be submitted detailing any such design changes <br /> that might result from the experience and engineering data gathered in the first phase This current <br /> document is the addendum so described in the CAP <br /> If you have questions about the content of this Addendum, or the CAP, or need other additional <br /> information, please contact me Thank you for this opportunity to serve your environmental needs <br /> Sincerely, <br /> ea-Phase Environ. nta. Inc <br /> Stephen M Lankford, RG, REA <br /> President <br /> cc Harlan Knoll, San Joaquin Co, PHS/EHD <br /> Tony Palma,Cutter Lumber Products <br /> 2937 Veneman Ave , #8240 Geo-Phase Environmental Inc Phone(209) 569-0293 <br /> Modesto, CA 95356 Fax(209)569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.