Laserfiche WebLink
' TABLE OF CONTENTS <br />' 1.0 INTRODUCTION <br /> I 1 Current Site Status <br /> 1 2 Changes to Scope of Work <br /> 2.0 PRELIMINARY WORK <br /> 21 Well Permitting <br /> 22 Air Pollution Control District Permit to Operate <br />' 3.0 VAPOR EXTRACTION & SPARGE WELL CONSTRUCTION <br /> 3 1 Soil Boring Installation <br /> 32 Vapor Extraction Well Construction <br />' <br /> 33 Air Sparge Well Construction <br /> 34 Well Development <br /> 35 Waste Disposal <br /> 4.0 SURFACE EQUIPMENT INSTALLATION & SYSTEM OPERATION <br /> 41 Equipment Installation <br /> 4 1 1 Carbon Unit Installation <br /> 4 1 2 Sparge Pump Installation <br /> 41.3 Conveyance Piping/Manifold Installation <br /> 42 System Operation <br /> 4 2 1 Vapor Extraction System Start-Up <br /> 422 Air Sparge System Start-Up <br /> 43 System Monitoring <br /> 4 3 1 Vapor Extraction Air Monitoring <br /> 432 Sparge Air Monitoring <br /> 433 In-Situ Groundwater Parameter Monitoring <br /> 5.0 SOIL, AIR & GROUNDWATER SAMPLING & ANALYSIS <br /> 51 Soil Sample Collection & Analysis <br /> 52 Groundwater Sample Collection & Analysis <br /> 53 Air Sample Collection & Analysis <br /> 6.0 REPORTING <br /> 61 Report of System Installation &Start-up <br /> 62 Quarterly Reporting <br /> 7.0 PROJECT TIME SCHEDULE <br /> 8.0 SIGNATURES AND CERTIFICATION <br /> List of Figures <br /> Vicinity Map 1 <br /> Detail Site Map Showing Existing& Proposed Well Locations 2 <br /> Proposed SVE Construction Schematic 3 <br /> Proposed Remedial System Manifold Construction Schematic 4 <br /> • <br /> 2937 Veneman Ave,#13240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209) 569-0295 <br /> I <br />