My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009541
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009541
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:28:28 PM
Creation date
7/30/2019 2:42:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009541
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' TABLE OF CONTENTS <br />' 1.0 INTRODUCTION <br /> I 1 Current Site Status <br /> 1 2 Changes to Scope of Work <br /> 2.0 PRELIMINARY WORK <br /> 21 Well Permitting <br /> 22 Air Pollution Control District Permit to Operate <br />' 3.0 VAPOR EXTRACTION & SPARGE WELL CONSTRUCTION <br /> 3 1 Soil Boring Installation <br /> 32 Vapor Extraction Well Construction <br />' <br /> 33 Air Sparge Well Construction <br /> 34 Well Development <br /> 35 Waste Disposal <br /> 4.0 SURFACE EQUIPMENT INSTALLATION & SYSTEM OPERATION <br /> 41 Equipment Installation <br /> 4 1 1 Carbon Unit Installation <br /> 4 1 2 Sparge Pump Installation <br /> 41.3 Conveyance Piping/Manifold Installation <br /> 42 System Operation <br /> 4 2 1 Vapor Extraction System Start-Up <br /> 422 Air Sparge System Start-Up <br /> 43 System Monitoring <br /> 4 3 1 Vapor Extraction Air Monitoring <br /> 432 Sparge Air Monitoring <br /> 433 In-Situ Groundwater Parameter Monitoring <br /> 5.0 SOIL, AIR & GROUNDWATER SAMPLING & ANALYSIS <br /> 51 Soil Sample Collection & Analysis <br /> 52 Groundwater Sample Collection & Analysis <br /> 53 Air Sample Collection & Analysis <br /> 6.0 REPORTING <br /> 61 Report of System Installation &Start-up <br /> 62 Quarterly Reporting <br /> 7.0 PROJECT TIME SCHEDULE <br /> 8.0 SIGNATURES AND CERTIFICATION <br /> List of Figures <br /> Vicinity Map 1 <br /> Detail Site Map Showing Existing& Proposed Well Locations 2 <br /> Proposed SVE Construction Schematic 3 <br /> Proposed Remedial System Manifold Construction Schematic 4 <br /> • <br /> 2937 Veneman Ave,#13240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209) 569-0295 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.