Laserfiche WebLink
S <br /> Addendum to Corrective Action Plan Page 3 <br /> Former Manna Pro Site <br /> Project No 207 3 <br /> . August 12,2002 <br />' and manifold system centrally located to assure adequate control of the remedial <br /> system <br />' • Continue quarterly groundwater monitoring, weekly monitoring of the remedial <br /> system, including monthly measurements of groundwater depth and air sample <br /> collection <br /> • Prepare a report of the installation of the remedial system Also complete four <br /> additional quarterly reports of the operation of the system <br /> Upon approval of this work plan by the LOP agency a detailed budget will be prepared <br /> and submitted to the State USTCFP for pre-approval of the expenditures <br /> 2937 Veneman Ave ,#11240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto,CA 95356 Fax(209) 569-0295 <br />