Laserfiche WebLink
Addendum to Corrective Action Plan Page 2 <br /> Former Manna Pro Site <br />' Project No 207 3 <br /> August 12,2002 <br />' As suspected, additional engineering details were obtained in the first phase that suggest <br /> it is appropriate to change some of the design plans for the complete remedial system <br /> These design alterations consist primarily of a modification of the well spacing, and the <br /> method of treating the process gas delivered from the VES system The following <br /> sections describe the changes in detail <br />' The method of sparging air into the saturated zone with the partial purpose of mobilizing <br /> hydrocarbons toward vapor extraction points is essentially a petroleum displacement <br />' technique One way to use the displacement technique efficiently is to establish a regular <br /> pattern or grid of vapor extraction wells in conjunction with a similar pattern of sparge <br /> wells We proposed to employ the "5-spot" pattern in which a "square" of four equally <br /> spaced sparge wells drive mobilized hydrocarbons toward a vapor extraction point <br /> located near the center of the four sparge wells as illustrated below <br />' Sparge � Sparge <br />' Extraction <br /> e <br /> • Sparge Sparge <br /> The spacing of this grid pattern was determined based upon on the radii of influence of <br /> the sparge and vapor extraction wells, respectively In the pilot test of 2000, it was <br /> concluded that the radius of influence was 24 feet for sparge wells and 55 feet for vapor <br /> extraction wells During the first phase operation, the vapor extraction radius of <br /> influence was determined to be 42 feet Based on the new information, we propose that <br /> the two groups of wells be placed on 50-foot centers (twice the sparge radius) In Figure <br /> 2, the detailed site map, a well grid has been superimposed over the area most severely <br /> impacted by gasoline The well grid in this figure suggests that 8 new sparge wells and <br /> 10 new vapor extraction wells are appropriate to mitigate the "core" of the contaminant <br /> plume <br /> 1.3.2 Scope of Work <br /> The tasks described in this addendum to the Corrective Action Plan encompass the <br /> following principal elements <br /> • Drill and construct 8 additional sparge wells and 10 additional vapor extraction wells <br /> o Obtain and install the surface equipment needed to operate the sparge and vapor <br /> extraction wells This will include the installation of necessary conveyance piping <br /> 1 2937 Veneman Ave,#13240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0295 <br /> I <br />