Laserfiche WebLink
1 <br /> Report—F,st Phase Remed,al System Page 9 <br /> Former Manna Pro Site <br /> I Project No 207 3 <br /> June 18,2002 <br /> Iconversion calculator supplied by the manufacturer was used to convert the pressure <br /> gradient to air flow rates, which were recorded <br /> In addition, the depth to water in monitoring well MW-1 was measured using an <br /> electronically actuated measuring tape accurate to 001 feet All of the operating <br /> parameters were recorded and a summary is attached in Summary Table 3 The two air <br /> samples were transferred to a state-certified analytical laboratory for testing The <br /> Iaboratory data sheets are attached as Appendix A-2 <br /> During the ensuing 95 days, the system was checked and serviced at least once each <br /> week All of the data parameters described above were measured and recorded In <br />' addition, the system was serviced by bleeding off any accumulated water from the free- <br /> water-knock-out and the sparge compressor's pressure tank The lubricating oil in the <br /> compressor was checked and the electricity consumption was monitored The summary <br />' of the data is attached as Summary Table 3 <br /> During the course of the project, the measured vapor extraction rate displayed a generally <br /> increasing trend although the vacuum pressure was maintained at about the same level <br /> We suspect that the Dwyer digital manometer became somewhat inaccurate and resulted <br /> • in an over-measurement of the extraction rates <br /> 3.2.2 Air Sparge System Start Up, Operation & Monitoring <br /> The air sparge system was started at the same time as the vapor extraction system on <br /> February 14, 2002 Initially, the air injection rate was set at 3 scfm During the course of <br />' the program, the infection rate was raised to as much as 7 scfm, although it was generally <br /> kept to less than 5 scfm The rate was checked and record at least once each week The <br /> tank of the sparge compressor was drained of any water build-up each week <br /> 2937 Veneman Ave, #13240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br /> I <br />