My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009545
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009545
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:20:51 PM
Creation date
7/30/2019 2:45:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009545
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> i - GEO-PHASE <br /> - ENVIRONMENTAL <br />' REPORT <br /> Quarterly Groundwater Monitoring Event <br />' Spring Quarter 2001 <br /> Former Manna Pro Site <br />' 4004 S. E1 Dorado Street <br /> Stockton, California <br /> Project No 207 2 <br /> July 11, 2001 <br /> 1.0 INTRODUCTION <br />' Groundwater monitoring wells were installed at the site at various times from <br /> 1990 to 1993 More recently, a deep monitoring well (MW-11) was constructed <br /> in April of 2000 Quarterly groundwater monitoring has been conducted at the <br /> site since the first wells were constructed This report documents a quarterly <br /> 1 round of groundwater monitoring and sampling completed on June 8, 2001 <br /> 1.1 Site History <br /> Two 10,000-gallon underground diesel tanks and two 5,000-gallon <br /> underground gasoline tanks and a single 10,000-gallon underground gasoline <br /> tank formerly in use at the site were removed in 1990 Confirmation soil <br /> samples collected from the tank pit contained elevated levels of gasoline and <br /> diesel range petroleum hydrocarbons Subsequently, several thousand yards <br /> of impacted soil were exacted and removed to help mitigate the release <br /> In October of 1990, ERM West conducted additional work to characterize the <br /> ilateral and vertical extent of the hydrocarbon contamination in the sub- <br /> surface This included installing 25 soil borings into groundwater of which, a <br /> total of 6 borings were later converted to groundwater monitoring wells <br /> Later, Groundwater Technology Inc (GTI) installed four additional monitoring <br />' 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.