My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009545
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009545
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:20:51 PM
Creation date
7/30/2019 2:45:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009545
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former Manna Pro Site Page 2 <br /> ' Quarterly Groundwater Monitoring Report <br /> Project No 207 2 <br /> . July 11, 2001 <br />' wells, a combination groundwater/vapor extraction well and three observation <br /> wells These wells were used for the completion of groundwater pumping and <br /> vapor extraction pilot tests <br /> Between 1996 and April of 2000, the principal remedial activity consisted of <br />' groundwater monitoring In April of 2000, a deep monitoring well (MW-11) <br /> was constructed to characterize the vertical distribution of hydrocarbons in the <br /> subsurface At the same time, a new vapor extraction well and an air sparge <br /> well were constructed as part of a pilot remedial test program The <br /> construction of MWD-11 was documented in the quarterly monitoring report <br /> for the spring 2000 monitoring event The results of the pilot test were <br />' documented in the July 31, 2000 report entitled Report Remedial Action Pilot <br /> Study Former Manna Pro Site To date, a total of 11 groundwater monitoring <br /> wells, 5 observation wells, and three test wells have been constructed on or <br /> near the Manna Pro site The San Joaquin County PHS-EHD recently <br /> concluded that the release at this site has been adequately characterized and <br />' directed that a Corrective Action Plan be prepared and submitted for approval <br /> The Corrective Action Plan dated February 16, 2001 has been approved and <br /> preliminary work has begun to implement the plan <br /> • 1.2 Scope of Work <br /> The following work was completed during this round of groundwater <br /> monitoring <br /> 1 The depth to groundwater was measured in 11 monitoring wells, 5 <br /> observation wells and 3 service wells located on, or near the site <br />' 2 Groundwater monitoring included sample collection and subsequent <br /> laboratory analysis from 5 monitoring wells <br /> r <br /> i <br />' 2937 Veneman Ave #B240 - Ph 2 <br /> Geo Phase Environmental Inc one ( 09) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br />
The URL can be used to link to this page
Your browser does not support the video tag.