My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8621
>
2900 - Site Mitigation Program
>
PR0523156
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:58:45 PM
Creation date
7/30/2019 3:51:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523156
PE
2950
FACILITY_ID
FA0015632
FACILITY_NAME
NORTRAX
STREET_NUMBER
8621
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19320005
CURRENT_STATUS
02
SITE_LOCATION
8621 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 INTRODUCTION <br /> This Health and Safety Plan (HSP) has been developed by ERM-West,Inc. <br /> (ERM) to establish the health and safety procedures required to minimize <br /> potential hazards to personnel who will be involved in the soil and <br /> ground water sampling activities planned for the Nortrax facility,located <br /> at 8835 South El Dorado Street,French Camp, California. A map of the <br /> site location and site plan is provided herein as Figure 1. <br /> The provisions of this HSP directly apply to ERM personnel and <br /> contractors who will be potentially exposed to safety and/or health <br /> hazards related to the project. This HSP does not directly apply to client <br /> personnel, although ERM will inform the client on the safety and health <br /> aspects of the work based upon the guidelines specified in this HSP. <br /> The procedures in this HSP have been developed based upon current <br /> knowledge regarding the specific chemical and physical hazards that are <br /> known or anticipated to be potentially associated with the operations to be <br /> conducted at the site. <br /> It is ERM's policy that activities covered by this HSP must be conducted in <br /> complete compliance with this HSP and with all applicable federal, state, <br /> and local health and safety regulations, including the California <br /> Occupational Safety and Health Administration (Cal/OSHA) Title 8, <br /> California Code of Regulations (CCR) 5192, and the Title 8,Subchapter 4, <br /> Construction Safety Orders, as applicable. <br /> On-site personnel who cannot, or will not, comply with the policies and <br /> requirements incorporated in the HSP will be excluded from project <br /> activities. Prior to the commencement of field activities, all ERM and <br /> subcontractor personnel covered by this HSP must review this document <br /> and sign and return the signature page to the Project Manager. A copy of <br /> this form is provided in the appendix section of the HSP. <br /> 1.1 SITE DESCRIPTION <br /> This section discusses the general history and physiography of the <br /> Nortrax facility. The site location is described and general site <br /> characteristics are presented. <br /> 5164.00-3/4/03 <br /> ERM <br /> HASP CANON 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.