My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8621
>
2900 - Site Mitigation Program
>
PR0523156
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:58:45 PM
Creation date
7/30/2019 3:51:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523156
PE
2950
FACILITY_ID
FA0015632
FACILITY_NAME
NORTRAX
STREET_NUMBER
8621
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19320005
CURRENT_STATUS
02
SITE_LOCATION
8621 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> 7.0 EMERGENCY RESPONSE/ACCIDENT INVESTIGATION <br /> The phone numbers of the police and fire departments, ambulance <br /> services,local hospital, and ERM representatives are provided in the <br /> reference sheet in Section 8 of this HSP. Directions to the nearest hospital <br /> are also provided on the sheet. The reference sheet will be maintained at <br /> the work site by the TM/HSO. <br /> Any accident/incident resulting in an OSHA recordable injury or illness, <br /> treatment at a hospital or physician's office, property damage, or a near- <br /> miss accident requires that an accident/incident report be completed and <br /> submitted to the ERM DIHS. A copy of this form is provided in Appendix <br /> A. The investigation will be initiated as soon as emergency conditions are <br /> under control. The purpose of this investigation is not to attribute blame, <br /> but to determine the pertinent facts so that repeat or similar occurrences <br /> can be avoided. <br /> 7.1 PLANNING <br /> Prior to facility entrance, the TM/HSO shall plan emergency actions and <br /> discuss them with personnel conducting project work. Initial planning <br /> includes establishing the best means for evacuation from the area in case <br /> of a catastrophe. <br /> 7.2 EMERGENCY SERVICES <br /> A tested system must exist for rapid and clear distress communications, <br /> preferably voice, from all personnel to the TM/HSO. The TM/HSO shall <br /> ensure that all personnel working at the facility know how to <br /> communicate with the appropriate local emergency response units as well <br /> as provide adequate and clear directions between work locations and the <br /> locations of support personnel, prior to commencing any facility <br /> investigation or operations. Emergency response contacts and telephone <br /> numbers are included in the emergency reference sheet provided in <br /> Section 8. A copy of this information must be posted in a visible location <br /> at the project site before operations commence. <br /> 5764.00-3/4/03 <br /> ERM <br /> HASP CANON 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.