Laserfiche WebLink
. . . ...... . . <br /> 3.0 Tank ui enf <br /> a. heck for leaks. Yes' No <br /> 3.1 Valves G IN <br /> I Tank drain valves Yes' No <br /> ,or be ke t locked, NIA <br /> E 3.2 Spill a.Inspect for debris, Y " No NIA <br /> containment residue,and water <br /> boxes on till In the box and <br /> pipe remove. <br /> In Drain valves must Yes" No I <br /> be operable and <br /> closed. <br /> 3.3 Liquid level a.Bath visual and Ye No' NIA n C h C <br /> equipment mechanical tlee <br /> must be be Inspected <br /> for physical <br /> damn e. <br /> to Check that the Ye No' NA <br /> device Is easily <br /> readable <br /> 34 ectup ll a.lfequtton wRha Yes No' WA r \ ��� � <br /> equipment "test'button \J f� <br /> activate the audible <br /> hom or light to <br /> operation. <br /> This could <br /> be <br /> battery powered. <br /> Replace the battery <br /> fneeded <br /> to.If overfill wNe is Yes No" N! <br /> equipped with a <br /> mechanical test <br /> mechanism,actuate <br /> the mechanism to <br /> confirm operation. <br /> 3.5 piping Check for leaks. s No p.. ^ ✓ S <br /> connections corrosion and <br /> Hama <br /> 4.OTank Attachment—HA urtenances <br /> 4.1 Ladderantl Secure with no sign Yes ela( YO sN� S lJ0.t-LR <br /> platform of severe worroslon !A ti Cw `GQ 1 <br /> structure or tlama e? <br /> 5.0 Other Conditions <br /> 5.1,Are there otheriamcitions that should Yes' <br /> be addressed for continued safe <br /> operation or that may affect the site spill <br /> revention IgM <br /> AST INSPECTION STANDARD SEPTEMBER 2011 <br /> COPYRIGHT©2011 Steel Tank Institute <br />