My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2800 - Aboveground Petroleum Storage Program
>
PR0516703
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 9:14:30 PM
Creation date
7/31/2019 10:57:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516703
PE
2832
FACILITY_ID
FA0003930
FACILITY_NAME
KING ISLAND MARINA
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
01
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . .. _ .......... . . <br /> STI SP001 Annual Inspection Checklist <br /> General inspection Information: <br /> le.,ve0on Date '7 36 -( 0 Retain Uref Dale: (36 mor&fs from i spec on date) <br /> Prior Inspection Dale: Z�S —j Inspecoc Name: <br /> Tanks Inspected(ID Ks): <br /> Inspection Guidance: <br /> i For equipment not Included in this Standard,follow tha manufacturer recommended inspection/testing 6" C, as and procedures. <br /> Y The periodic AST Inapecfion is intended for monilodng the axtemal AST condition and its containment structure.This visual inspection does not require a Certifed <br /> Inspector. It shall be performed by an owner's I flountorwho is familiarwfth the site and ran idamify changes and developing problems. <br /> Y Remove promptly upon discovery atantling water or liquid in the primary tank,secondary containment area,inferstia,or spill croMairrer. Before discharge to the <br /> environment,inspect the liquid for regulated products or other wntamirome and disposed of it properly. <br /> Y In order to comply with EPA SPCC(Spill Prevention,Control and Countermeasure)mlas,a facility must regularly test liquid level sensing devices to ensure proper <br /> operation(40 CFR <br /> v (')designates an item in a non-conformance status.This indicates that action is required to address a problem. <br /> Y Nonconform ng items in content ttank or containment integrity require evaluation by an engineer experienced in AST design,a Ckm ifad Inspector, or a tank <br /> manufacturer who will determine the corrective action, Note the nonconformance and corresponding corrective action in the comment section. <br /> Retain the completed checklists for 36 months. <br /> Y Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists. <br /> > Note: If a change has occurred to the tank system or containment that may affect the SPCC plan,the condition should be evaluated against the current <br /> plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation. <br /> Item Task Status Comments <br /> 1.0 Tank Containment <br /> 1.1 Containment Check for: Yes' No Tk� <br /> structure • Holes or cracks in 1 \�W, � Sip <br /> containment wall \�JJ Y <br /> or floor <br /> Washout <br /> • Linerdegmdation <br /> Corrosion <br /> Leakage <br /> • Paint failure <br /> • Tank settlin <br /> r <br /> 2.0 Tank Foundation and SI ort. <br /> 2.1 Foundation Senlement or Y No y c�f\`nnA <br /> foundation washout? <br /> 2,2Concmte pad Cracking or spatting? Yes' N N'A <br /> or ring wall <br /> AST INSPECTION STANDARD $ SEPTEMBER 2011 <br /> COPYRIGHT©20YI Steel Tank Institute <br />
The URL can be used to link to this page
Your browser does not support the video tag.