Laserfiche WebLink
. . .. _ .......... . . <br /> STI SP001 Annual Inspection Checklist <br /> General inspection Information: <br /> le.,ve0on Date '7 36 -( 0 Retain Uref Dale: (36 mor&fs from i spec on date) <br /> Prior Inspection Dale: Z�S —j Inspecoc Name: <br /> Tanks Inspected(ID Ks): <br /> Inspection Guidance: <br /> i For equipment not Included in this Standard,follow tha manufacturer recommended inspection/testing 6" C, as and procedures. <br /> Y The periodic AST Inapecfion is intended for monilodng the axtemal AST condition and its containment structure.This visual inspection does not require a Certifed <br /> Inspector. It shall be performed by an owner's I flountorwho is familiarwfth the site and ran idamify changes and developing problems. <br /> Y Remove promptly upon discovery atantling water or liquid in the primary tank,secondary containment area,inferstia,or spill croMairrer. Before discharge to the <br /> environment,inspect the liquid for regulated products or other wntamirome and disposed of it properly. <br /> Y In order to comply with EPA SPCC(Spill Prevention,Control and Countermeasure)mlas,a facility must regularly test liquid level sensing devices to ensure proper <br /> operation(40 CFR <br /> v (')designates an item in a non-conformance status.This indicates that action is required to address a problem. <br /> Y Nonconform ng items in content ttank or containment integrity require evaluation by an engineer experienced in AST design,a Ckm ifad Inspector, or a tank <br /> manufacturer who will determine the corrective action, Note the nonconformance and corresponding corrective action in the comment section. <br /> Retain the completed checklists for 36 months. <br /> Y Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists. <br /> > Note: If a change has occurred to the tank system or containment that may affect the SPCC plan,the condition should be evaluated against the current <br /> plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation. <br /> Item Task Status Comments <br /> 1.0 Tank Containment <br /> 1.1 Containment Check for: Yes' No Tk� <br /> structure • Holes or cracks in 1 \�W, � Sip <br /> containment wall \�JJ Y <br /> or floor <br /> Washout <br /> • Linerdegmdation <br /> Corrosion <br /> Leakage <br /> • Paint failure <br /> • Tank settlin <br /> r <br /> 2.0 Tank Foundation and SI ort. <br /> 2.1 Foundation Senlement or Y No y c�f\`nnA <br /> foundation washout? <br /> 2,2Concmte pad Cracking or spatting? Yes' N N'A <br /> or ring wall <br /> AST INSPECTION STANDARD $ SEPTEMBER 2011 <br /> COPYRIGHT©20YI Steel Tank Institute <br />