Laserfiche WebLink
. _. . ............ <br /> STI SP001 Moi Inspection Checklist <br /> General In. ection Information: SII <br /> n 1 Retain Until Date' (36 months from inspeefion dd e) <br /> Inspection Dater <br /> Prior,inspection Date- —30.—, � Inspedor Name: <br /> Teri inspected(ID Cs}: <br /> Inspection Guidance: <br /> > For equipment not induced in this Standard follow the manufacturer recommended inspectionitesting schedules and proal inspection <br /> v The periodic AST Inspection is:mended for monitoring the external AST condition and its containment structure.This visual insdoes not require a Certified <br /> Inspector. It shall be performed by an owner's inspector who is familiar with the site and can identify changes and devebping problems, <br /> > Upon discovery cf water in the primary tank,secondary containment area, interstice,or spill container,remove promptly or take other corrective action.Beiore <br /> discharge to the environment,inspect the liquid for regulated products or other contaminants and disposed of it property. <br /> > (`)designates an item in a non-conformance status.This indicates that action is required to address a problem. a Certified Inspector, or a tank <br /> > Nononforming items j p rto 1 t tank ta'nm-irm ptegrhv require evaluation by an engineer experienced In AST design, p <br /> manufacturer who will determine the corrective action, Note the non-conformance and corresponding corrective action in the comment aspirin. <br /> > Retain the completed checklists for 36 months, <br /> r In the event of severe weather(snow,ice,wind storms)or maintenance(such as painting)that could affect the operation of critical component, <br /> (normal and emergency vents,valves),an inspection of these cam Imports is required as soon as the equipment is safely accessible after the event. <br /> Item <br /> Task Status Comments <br /> 1.1 Tank inmenContatnment Yes" No L£ �2 <br /> 1.1 Containment Check In,water, NIA <br /> structure debris,cracks or Lire Gu. Jv}a <br /> hazard <br /> 1.2 Prima tank Check for wirer Yee ` No <br /> inm <br /> 1.3 Contentment Operable and in a <br /> drain valves closed osition Ni <br /> 1.4 Pathways end Clear and Yes <br /> entry 9ateaJdcors N1A <br /> o erable <br /> 2.0 Leak Detection yes° No <br /> 2.1 Taok Visible signs of N <br /> leaks e <br /> 2,2 Secondary Visible signs of Yes" No � <br /> Ccntamment leakage from tank <br /> into secondary <br /> containment <br /> 2.3 Surmunding Visible signs of <br /> Soil leaks e C� <br /> 2A Interstice Visible signs of Yes' <br /> leaks a NIA <br /> INSPECTION STANDARD <br /> 4 SEPTEMBER 2011 <br /> CO <br /> COPYRIGHTS 2U11 Steel Tank Institute <br />