Laserfiche WebLink
3.0 Tank Equi ment <br /> Ve No <br /> i 3,1 Vf— alVas s.Check for leaks. 1 <br /> b.Tank drain valves <br /> must be ke t locked. N!A <br /> 32 Spill a,Inspect for debris, Yes' No NA <br /> containment residue,and water <br /> boxes on fill in the box and <br /> pipe remove. <br /> b.Drain valves must Yrs' N NIA <br /> be operable and <br /> closed. <br /> 3.3 Liquic level a,Both visual and Yes No' NIA <br /> equipment mechanical devices <br /> minspected <br /> r physical <br /> dome aical V Q <br /> dome Check <br /> 1 <br /> It. Check that the Yes No` N/A <br /> device is easily <br /> readable <br /> 34 Overfill a.if equipped witha Yes No' NIA <br /> equipment "ari biflon, <br /> activate the audible <br /> horn or light to <br /> confirm operation. <br /> This could be <br /> battery powered. <br /> Replace the battery <br /> ifneeded <br /> to If overfill valve a Yes NT NA <br /> equipped with a <br /> mechanical lest <br /> mechanism,actuate <br /> the mechanism to <br /> confirmo eration. <br /> 35 Piping Check for leaks, Ye No <br /> connections corrosion and + <br /> dome <br /> QD Tank Attaehmerls and A utterances <br /> 4.1 Ladderand Secure with no sign Yes o' <br /> platformof severe corrosiona <br /> structure crdama e? <br /> 5.0 Other Conditions <br /> 5.1 Are there other conditions that should Yes No <br /> be addresaetl for continued safe <br /> operation of that may affect the site spill <br /> reveraon lan9 <br /> Ayr INSPECTION STANDARD 5 SEPTEMBER 2011 <br /> COPYRIGHTO 2011 Steel Tank Institute <br />