Laserfiche WebLink
..._ ............... . . . <br /> C.Make sure fusible :esN/A <br /> ent is in place <br /> and wrreotly <br /> osition.6.d. Be sure test ports No^ Ni <br /> are sealed with plug <br /> after testing is <br /> complete and no <br /> temporary test fixture <br /> or component remains <br /> connected to valve. <br /> 5.31ntersbtial Check condition of e No' N/A <br /> leak detection equipment,including'. <br /> eo,ulpment The window is <br /> clean and clear in f <br /> sightleak gauges. <br /> The wire <br /> connections of <br /> electronic gauges <br /> for tightness and <br /> corrosion <br /> • Activate the at <br /> button, if <br /> a ticable. <br /> 5 4 Spill a. If corrosion, <br /> containment damage,or wear has <br /> boxes on fill compromised the <br /> pipe ability of the unitto <br /> perform spill <br /> containment functions, <br /> re lace the unit. <br /> b.Inspect the No N/A <br /> connections to the <br /> AST for tightness, as <br /> well as the bolts, <br /> nuts,washers for <br /> condition and replace <br /> if racessa Y. <br /> c. Drain valves must Yes" No N/ <br /> be operable and <br /> closed <br /> 5.5 Strainer a.Check that the YesNo' <br /> strainer is clean and in <br /> good condition. <br /> AST INSPECTION STANDARD SEPTEMBER 2011 <br /> COPYRIGHTC)2011 Steel Tank Institute <br />