Laserfiche WebLink
h <br /> I <br /> Stantec <br /> Quarterly Status Summary Report - Fourth Quarter 2011 <br /> ARCO Service Station No. 2130 <br /> February 29, 2012 <br /> Department (CSMUD), California Water Service (CWS), and the local water purveyors to <br /> ascertain the location and pertinent well construction information of nearby wells ; and a 500 foot <br /> field reconnaissance to locate and/or confirm the presence of wells or other sensitive receptors. <br /> DWR identified no well records within the Township , Range, and Section in which the site is <br /> located. The nearest wells identified in DWR records are located approximately 2,200 ft to the <br /> northwest of the site . <br /> URS contacted CSMUD to ascertain whether they operated any wells in the vicinity of the site. <br /> According to CSMUD, there are two city wells operating within 2, 000 ft of the site . City well <br /> No. 4 located 1 ,200 ft south-southeast of the site on Segovia Lane is 600 ft deep and has a <br /> production capacity of 1 .5 million gallons per day (mgd ). City well No . 12 located 1 ,600 ft south <br /> of the site at 341 Leslie Avenue is 410 ft deep and has a production capacity of 0. 82 mgd . <br /> Additionally, URS contacted the Stockton office of CWS to ascertain whether they operated any <br /> wells in the vicinity of the ARCO site. CWS determined that it does not own or operate any <br /> wells within 2, 000 ft of the site. <br /> On December 6 , 2004, URS performed a 500 foot field reconnaissance to identify and/or verify <br /> the location of wells , water bodies, and schools. No surface water bodies, schools , or wildlife <br /> habitats were identified within 500 ft of the site. The nearest school identified is Pulliam <br /> Elementary, located approximately 1 ,300 ft southeast of the site. <br />� Monitoring and Sampling <br /> E The site is sampled semiannually during 1Q and 3Q. No groundwater monitoring or sampling <br /> was conducted during 4Q11 . <br /> i <br /> Current Assessment Activities <br /> No assessment activities were conducted during 4Q11 . <br /> Remediation Status <br /> There is currently no active remediation being conducted at the site. <br /> Waste Disposal Summary <br /> No waste was generated during 4Q11 . <br /> Recent Correspondence <br /> No correspondence was received during 4Q11 . <br /> This Quarters Activities (Fourth — 2011) <br /> 1 . Stantec prepared and submitted the SMR 3Q11 on November 15, 2011 . <br /> f <br /> Next Quarter's Activities (First — 2012) <br /> f 1 . Stantec will prepare and submit the QSSR - 4Q11 , <br /> 4 2 . Stantec will perform the semiannual groundwater monitoring and sampling event. <br /> t3. Stantec will initiate the scope of work described in Stantec's Hydrogen Peroxide <br /> Injection Work Plan dated July 27 , 2011 once appropriate permits are obtained . <br /> i <br /> E <br /> 2130 QSSR 4Q11 .doc 2 <br /> 6 <br />