My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012685
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0012685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:36:23 PM
Creation date
8/1/2019 10:22:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012685
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> February 14, 1992 <br /> ARCO Service Station No. 2130, Stockton, California <br /> OBTAINING APPROVAL FOR TANK INSTALLATION <br /> _ With ARCO's approval, laboratory results and a map showing sample locations will be <br /> ® provided to the SJCPHS-EHD to expedite the installation of the new underground storage <br /> tanks and product lines and the installation of piping for a VES. The layout of the VES will <br /> be based on results of our December vapor-extraction test. These tasks will be conducted <br /> after the SJCPHS-EHD receives the laboratory reports and approves the work. <br /> REPORT PREPARATION <br /> ® Within 3 months of completing the field work, RESNA will submit to ARCO a report <br /> summarizing our field methods, laboratory procedures, laboratory results, conclusions and <br /> our plans for further work to delineate the lateral and vertical extent of residual <br /> _ 0 hydrocarbons. Information gathered will be considered confidential and released only with <br /> authorization of ARCO. <br /> PROJECT PERSONNEL <br /> Mr. Richard 1-1. Walls. a Registered Civil Engineer (P.E. No. 43139) in the State of <br /> California, will be in ch?rare of the project. Ms. Eloise Cherven , Project Geologist, will <br /> ® manage field and office operations. RESNA employs a staff of engineers, geologists, and <br /> technicians whose services will be used to see the project through to completion. <br /> j. <br /> A <br /> -' 30003.4w i I <br /> k <br />
The URL can be used to link to this page
Your browser does not support the video tag.