Laserfiche WebLink
r- ERNE �ili§ <br /> 10 1ME <br /> Work Plan May 17, 1991 <br /> ARCO Service Station No. 2130, Stockton, California AGS 30003-1W <br /> If gasoline hydrocarbons in soil are detected in samples collected from these borings and <br /> the extent of the gasoline hydrocarbons is not defined after the tank removal,with <br /> ARCO's authorization, we will conduct an additional investigation. Before conducting <br /> this investigation, an addendum to this work plan discussing the drilling of additional soil <br /> borings to delineate gasoline hydrocarbons in soil will be submitted to the SJPHS <br /> approximately 3 months after the tank removal project is completed. We will investigate <br /> ground water for gasoline hydrocarbons if warranted. Information gathered will be <br /> considered confidential and released only with the authorization of ARCO. <br /> PROJECT'PERSONNEL <br /> Mr.John Bailey Bobbitt, a Registered Geologist (R.G. 4313) in the State of California, <br /> `~ will be in charge of the project. Ms. Eloise Frick, Project Geologist, will manage field <br /> and office operations. Applied GeoSystems employs a staff of engineers, geologists, and <br /> technicians whose services will be used to see the project through to completion. <br /> �,. 12 <br /> A,volied Geosyslems <br />