My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012685
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
ARCHIVED REPORTS XR0012685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:36:23 PM
Creation date
8/1/2019 10:22:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012685
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r- ERNE �ili§ <br /> 10 1ME <br /> Work Plan May 17, 1991 <br /> ARCO Service Station No. 2130, Stockton, California AGS 30003-1W <br /> If gasoline hydrocarbons in soil are detected in samples collected from these borings and <br /> the extent of the gasoline hydrocarbons is not defined after the tank removal,with <br /> ARCO's authorization, we will conduct an additional investigation. Before conducting <br /> this investigation, an addendum to this work plan discussing the drilling of additional soil <br /> borings to delineate gasoline hydrocarbons in soil will be submitted to the SJPHS <br /> approximately 3 months after the tank removal project is completed. We will investigate <br /> ground water for gasoline hydrocarbons if warranted. Information gathered will be <br /> considered confidential and released only with the authorization of ARCO. <br /> PROJECT'PERSONNEL <br /> Mr.John Bailey Bobbitt, a Registered Geologist (R.G. 4313) in the State of California, <br /> `~ will be in charge of the project. Ms. Eloise Frick, Project Geologist, will manage field <br /> and office operations. Applied GeoSystems employs a staff of engineers, geologists, and <br /> technicians whose services will be used to see the project through to completion. <br /> �,. 12 <br /> A,volied Geosyslems <br />
The URL can be used to link to this page
Your browser does not support the video tag.